| Project | 6- laning of the Vadakancherry-Thrissur section of NH-47 design change from km 236.135 to km 264.490 km (28.355 km length) in the state of Kerala on Design -Build-Finance-Operate (DBFO) basis |
| Authority | National Highways Authority of India |
| Pavement Details | 6-lane, flexible |
| Lane-Kms | 170.13 |
| Appointed Date | September 15, 2012 |
| PCOD | March 9, 2022 |
| COD | June 14, 2024 |
| Concession Period | 20 years |
